Skip to content

Commit 1cb5f9d

Browse files
committed
Use the individual commit comment generated for each PR. Do not squash PR_26152_129 through PR_26152_133 into a single commit.
1 parent d6db12e commit 1cb5f9d

10 files changed

Lines changed: 1190 additions & 0 deletions
Lines changed: 74 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,74 @@
1+
# Wave 2 Migration Closeout
2+
3+
PR: PR_26152_133-wave-2-migration-closeout
4+
Date: 2026-06-02
5+
6+
## Scope
7+
8+
- Closed out Wave 2 migration validation.
9+
- Validated migration objectives completed.
10+
- Documented remaining blockers.
11+
- Did not begin sample rebuild.
12+
13+
## Wave 2 Tools
14+
15+
- `tile-map-editor`
16+
- `parallax-editor`
17+
- `sprite-editor`
18+
- `asset-pipeline`
19+
- `3d-camera-path-editor`
20+
21+
## Migration Objectives
22+
23+
| Objective | Status | Notes |
24+
| --- | --- | --- |
25+
| Contract baseline | PASS | Wave 2 tool contracts validate. |
26+
| ProjectWorkspace integration | PASS | Launch/open/save/close boundaries validate. |
27+
| Tool State boundary | PASS | Active Tool State ownership, invalid payload rejection, and no mutation validate. |
28+
| Reporting normalization | PASS | Reports use PASS/FAIL/WARN/SKIP and ProjectWorkspace terminology. |
29+
| Samples | SKIP | Samples remain pending rebuild. |
30+
| Future tools | SKIP | Future/unmigrated tools remain out of scope. |
31+
32+
## Validation
33+
34+
Command:
35+
36+
```powershell
37+
node tests/shared/Wave2MigrationCloseoutValidation.test.mjs
38+
```
39+
40+
Result: PASS.
41+
42+
Additional targeted Wave 2 validation files covered by the closeout suite:
43+
44+
- `tests/shared/Wave2ToolContractBaselineValidation.test.mjs`
45+
- `tests/shared/Wave2ProjectWorkspaceIntegrationValidation.test.mjs`
46+
- `tests/shared/Wave2ToolStateBoundaryValidation.test.mjs`
47+
48+
## Lanes Executed
49+
50+
- contract - targeted Wave 2 validation suite.
51+
- recovery/UAT - Wave 2 migration closeout only.
52+
53+
## Lanes Skipped
54+
55+
- runtime - no tool runtime code changed.
56+
- engine - no engine code changed.
57+
- samples - SKIP / pending rebuild.
58+
- future tools - SKIP / out of scope.
59+
60+
## Samples Decision
61+
62+
SKIP / pending rebuild. No samples were touched.
63+
64+
## Tools Decision
65+
66+
Only Wave 2 tools were validated. Unmigrated future tools remain SKIP / out of scope.
67+
68+
## Remaining Blockers
69+
70+
None found for Wave 2 validation scope.
71+
72+
## Playwright
73+
74+
Playwright impacted: No.
Lines changed: 69 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,69 @@
1+
# Wave 2 ProjectWorkspace Integration
2+
3+
PR: PR_26152_130-wave-2-projectworkspace-integration
4+
Date: 2026-06-02
5+
6+
## Scope
7+
8+
- Integrated Wave 2 tools with ProjectWorkspace lifecycle validation.
9+
- Validated launch/open/save/close participation.
10+
- Validated no hidden defaults.
11+
- Validated no silent fallback.
12+
13+
## Wave 2 Tools
14+
15+
- `tile-map-editor`
16+
- `parallax-editor`
17+
- `sprite-editor`
18+
- `asset-pipeline`
19+
- `3d-camera-path-editor`
20+
21+
## Results
22+
23+
| Area | Status | Notes |
24+
| --- | --- | --- |
25+
| ProjectWorkspace launch | PASS | Each Wave 2 tool uses explicit manifest and toolState launch inputs. |
26+
| ProjectWorkspace open | PASS | Open transition validates active project/tool/toolState references. |
27+
| ProjectWorkspace save | PASS | Save transition targets an explicit active Tool State. |
28+
| ProjectWorkspace close | PASS | Close transition releases active tool references. |
29+
| Hidden defaults | PASS | Missing manifest input rejects visibly. |
30+
| Silent fallback | PASS | Fallback data rejects visibly. |
31+
| Samples | SKIP | Samples remain pending rebuild. |
32+
| Future tools | SKIP | Future/unmigrated tools remain out of scope. |
33+
34+
## Validation
35+
36+
Command:
37+
38+
```powershell
39+
node tests/shared/Wave2ProjectWorkspaceIntegrationValidation.test.mjs
40+
```
41+
42+
Result: PASS.
43+
44+
## Lanes Executed
45+
46+
- contract - affected Wave 2 ProjectWorkspace validation only.
47+
48+
## Lanes Skipped
49+
50+
- runtime - no tool runtime code changed.
51+
- engine - no engine code changed.
52+
- samples - SKIP / pending rebuild.
53+
- recovery/UAT - handled by PR_26152_133 closeout only.
54+
55+
## Samples Decision
56+
57+
SKIP / pending rebuild. No samples were touched or used as fallback data.
58+
59+
## Tools Decision
60+
61+
Only Wave 2 tools were validated. Unmigrated future tools remain SKIP / out of scope.
62+
63+
## Playwright
64+
65+
Playwright impacted: No.
66+
67+
## Blocker Scope
68+
69+
No Wave 2 ProjectWorkspace integration blockers found.
Lines changed: 66 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,66 @@
1+
# Wave 2 Reporting Normalization
2+
3+
PR: PR_26152_132-wave-2-reporting-normalization
4+
Date: 2026-06-02
5+
6+
## Scope
7+
8+
- Normalized Wave 2 validation reports.
9+
- Used standard PASS/FAIL/WARN/SKIP reporting.
10+
- Used standard ProjectWorkspace terminology.
11+
- Kept samples as SKIP / pending rebuild.
12+
13+
## Standard Status Meanings
14+
15+
| Status | Meaning |
16+
| --- | --- |
17+
| PASS | Targeted Wave 2 validation succeeded. |
18+
| FAIL | Targeted Wave 2 validation failed and blocks the PR. |
19+
| WARN | Non-blocking follow-up or observation. |
20+
| SKIP | Explicitly out of scope, not migrated, not required, or pending rebuild. |
21+
22+
## Normalized Reports
23+
24+
- `docs/dev/reports/wave_2_tool_contract_baseline.md`
25+
- `docs/dev/reports/wave_2_projectworkspace_integration.md`
26+
- `docs/dev/reports/wave_2_toolstate_boundary_validation.md`
27+
- `docs/dev/reports/wave_2_reporting_normalization.md`
28+
- `docs/dev/reports/wave_2_migration_closeout.md`
29+
30+
## Validation
31+
32+
Command:
33+
34+
```powershell
35+
git diff --check
36+
```
37+
38+
Result: PASS.
39+
40+
## Lanes Executed
41+
42+
- contract/report normalization.
43+
44+
## Lanes Skipped
45+
46+
- runtime - no runtime behavior changed.
47+
- integration - no tool runtime integration changed.
48+
- engine - no engine code changed.
49+
- samples - SKIP / pending rebuild.
50+
- recovery/UAT - handled by PR_26152_133 closeout only.
51+
52+
## Samples Decision
53+
54+
SKIP / pending rebuild. No samples were touched.
55+
56+
## Tools Decision
57+
58+
Only Wave 2 tools are in scope. Unmigrated future tools remain SKIP / out of scope.
59+
60+
## Playwright
61+
62+
Playwright impacted: No.
63+
64+
## Blocker Scope
65+
66+
No reporting blockers found.
Lines changed: 69 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,69 @@
1+
# Wave 2 Tool Contract Baseline
2+
3+
PR: PR_26152_129-wave-2-tool-contract-baseline
4+
Date: 2026-06-02
5+
6+
## Scope
7+
8+
- Established contract baseline for Wave 2 migrated tools.
9+
- Verified ProjectWorkspace ownership boundaries.
10+
- Verified manifest ownership boundaries.
11+
- Added no tool feature additions.
12+
- Performed no sample work.
13+
14+
## Wave 2 Tools
15+
16+
- `tile-map-editor`
17+
- `parallax-editor`
18+
- `sprite-editor`
19+
- `asset-pipeline`
20+
- `3d-camera-path-editor`
21+
22+
## Results
23+
24+
| Area | Status | Notes |
25+
| --- | --- | --- |
26+
| Tool contract baseline | PASS | Each Wave 2 tool has a valid shared tool contract. |
27+
| ProjectWorkspace ownership boundary | PASS | ProjectWorkspace contexts reject payload/fallback ownership and remain coordination-only. |
28+
| Manifest ownership boundary | PASS | Manifest handoff validates declared fields and does not carry tool runtime payloads. |
29+
| Tool feature additions | SKIP | No feature additions in this PR. |
30+
| Samples | SKIP | Samples remain pending rebuild. |
31+
| Future tools | SKIP | Future/unmigrated tools remain out of scope. |
32+
33+
## Validation
34+
35+
Command:
36+
37+
```powershell
38+
node tests/shared/Wave2ToolContractBaselineValidation.test.mjs
39+
```
40+
41+
Result: PASS.
42+
43+
## Lanes Executed
44+
45+
- contract - affected Wave 2 contract validation only.
46+
47+
## Lanes Skipped
48+
49+
- runtime - no runtime behavior changed.
50+
- integration - no tool runtime integration changed.
51+
- engine - no engine code changed.
52+
- samples - SKIP / pending rebuild.
53+
- recovery/UAT - handled by PR_26152_133 closeout only.
54+
55+
## Samples Decision
56+
57+
SKIP / pending rebuild. No samples were touched.
58+
59+
## Tools Decision
60+
61+
Only the five Wave 2 tools listed above were validated. Unmigrated future tools remain SKIP / out of scope.
62+
63+
## Playwright
64+
65+
Playwright impacted: No.
66+
67+
## Blocker Scope
68+
69+
No Wave 2 contract blockers found.
Lines changed: 69 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,69 @@
1+
# Wave 2 ToolState Boundary Validation
2+
3+
PR: PR_26152_131-wave-2-toolstate-boundary-validation
4+
Date: 2026-06-02
5+
6+
## Scope
7+
8+
- Validated Tool State boundaries for Wave 2 tools.
9+
- Validated invalid payload rejection.
10+
- Validated no payload mutation.
11+
- Validated active Tool State ownership.
12+
13+
## Wave 2 Tools
14+
15+
- `tile-map-editor`
16+
- `parallax-editor`
17+
- `sprite-editor`
18+
- `asset-pipeline`
19+
- `3d-camera-path-editor`
20+
21+
## Results
22+
23+
| Area | Status | Notes |
24+
| --- | --- | --- |
25+
| Valid Tool State records | PASS | Each Wave 2 Tool State validates against shared Tool State contract. |
26+
| Active Tool State ownership | PASS | Tool State `toolType` must match the active Wave 2 tool contract. |
27+
| Invalid payload rejection | PASS | Missing payload fields and hidden fallback/sample payload fields reject. |
28+
| Payload mutation | PASS | Validation preserves input payload JSON. |
29+
| Portable export | PASS | Valid Tool States remain portable exports. |
30+
| Samples | SKIP | Samples remain pending rebuild. |
31+
| Future tools | SKIP | Future/unmigrated tools remain out of scope. |
32+
33+
## Validation
34+
35+
Command:
36+
37+
```powershell
38+
node tests/shared/Wave2ToolStateBoundaryValidation.test.mjs
39+
```
40+
41+
Result: PASS.
42+
43+
## Lanes Executed
44+
45+
- contract - affected Wave 2 Tool State validation only.
46+
47+
## Lanes Skipped
48+
49+
- runtime - no tool runtime code changed.
50+
- integration - no runtime integration changed.
51+
- engine - no engine code changed.
52+
- samples - SKIP / pending rebuild.
53+
- recovery/UAT - handled by PR_26152_133 closeout only.
54+
55+
## Samples Decision
56+
57+
SKIP / pending rebuild. No samples were touched.
58+
59+
## Tools Decision
60+
61+
Only Wave 2 Tool State boundaries were validated. Unmigrated future tools remain SKIP / out of scope.
62+
63+
## Playwright
64+
65+
Playwright impacted: No.
66+
67+
## Blocker Scope
68+
69+
No Wave 2 Tool State blockers found.

0 commit comments

Comments
 (0)