Skip to content

Commit e364946

Browse files
committed
Add Team Charlie final closeout
1 parent 245c30d commit e364946

7 files changed

Lines changed: 252 additions & 5 deletions
Lines changed: 22 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,22 @@
1+
# PR_26175_CHARLIE_028 Branch Validation
2+
3+
## Startup
4+
5+
- Started after PR #164 and PR #167 were merged.
6+
- Returned to `main`.
7+
- Pulled `origin/main`.
8+
- Verified local `main` commit: `245c30dda9cf`.
9+
- Verified worktree clean.
10+
- Verified local/origin sync: `0/0`.
11+
12+
## Branch
13+
14+
- Branch: `pr/26175-CHARLIE-028-team-charlie-final-closeout`
15+
- Base: `main`
16+
- Scope: final Team Charlie closeout report artifacts only.
17+
18+
## Result
19+
20+
- PASS: branch created from clean synced `main`.
21+
- PASS: no runtime files changed.
22+
- PASS: no UI, API, database, backlog, roadmap, or Project Instruction source files changed.
Lines changed: 21 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,21 @@
1+
# PR_26175_CHARLIE_028 Manual Validation Notes
2+
3+
## Manual Review
4+
5+
- Confirmed PR #164 is merged.
6+
- Confirmed PR #167 is merged.
7+
- Confirmed `main` was clean and synchronized before PR_028 branch creation.
8+
- Confirmed Team Charlie System Health ownership bullets are present.
9+
- Confirmed Environment Isolation & Developer Experience is Cancelled / Not Doing.
10+
- Confirmed System Health v1 is complete in backlog and roadmap.
11+
- Confirmed future enhancements are separated.
12+
- Confirmed no open Team Charlie PRs existed after PR #167 merged and before PR_028 was opened.
13+
- Confirmed no Team Charlie review requests were found for `ToolboxAid`.
14+
- Confirmed Charlie branch inventory was reviewed.
15+
- Confirmed no Charlie runtime work remains unmerged.
16+
17+
## Scope Check
18+
19+
PR_028 changes are limited to report artifacts under `docs_build/dev/reports/`.
20+
21+
No runtime, UI, API, database, backlog, roadmap, or Project Instruction source files are changed.
Lines changed: 32 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,32 @@
1+
# PR_26175_CHARLIE_028 Requirement Checklist
2+
3+
- PASS: Review PR #164 final state.
4+
- PASS: Verify PR #164 docs/governance-only scope.
5+
- PASS: Verify PR #164 reports and ZIP artifact.
6+
- PASS: Merge PR #164, or confirm it was already merged.
7+
- PASS: Return to `main` after PR #164 merge.
8+
- PASS: Review PR #167 final state.
9+
- PASS: Verify PR #167 reports-only scope.
10+
- PASS: Verify PR #167 does not change runtime, roadmap, backlog, or Project Instructions.
11+
- PASS: Merge PR #167.
12+
- PASS: Return to clean synced `main` after PR #167 merge.
13+
- PASS: Audit GitHub for open/draft Charlie PRs.
14+
- PASS: Audit Charlie review requests.
15+
- PASS: Audit Charlie branches.
16+
- PASS: Audit backlog.
17+
- PASS: Audit roadmap.
18+
- PASS: Audit Project Instructions.
19+
- PASS: Audit runtime.
20+
- PASS: Verify required reports exist.
21+
- PASS: Create final closeout report.
22+
- PASS: Create validation report.
23+
- PASS: Create branch validation report.
24+
- PASS: Create requirement checklist.
25+
- PASS: Create manual validation notes.
26+
- PASS: Create `codex_review.diff`.
27+
- PASS: Create `codex_changed_files.txt`.
28+
- PASS: Create repo-structured ZIP under `tmp/`.
29+
- PASS: Push PR_028 branch.
30+
- PASS: Open PR_028 draft PR.
31+
- PASS: Do not delete branches.
32+
- PASS: Do not merge PR_028 without separate Owner approval.
Lines changed: 54 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,54 @@
1+
# PR_26175_CHARLIE_028 Validation Report
2+
3+
## Commands
4+
5+
```text
6+
git status --short --branch
7+
```
8+
9+
Result: PASS. `main` was clean and synchronized before PR_028 branch creation.
10+
11+
```text
12+
git rev-list --left-right --count origin/main...HEAD
13+
```
14+
15+
Result before PR_028 branch creation: `0 0`.
16+
17+
```text
18+
git diff --check
19+
```
20+
21+
Result: PASS.
22+
23+
```text
24+
git diff --name-only
25+
```
26+
27+
Result: PASS. PR_028 changes are limited to `docs_build/dev/reports/`.
28+
29+
```text
30+
rg -n "System Health v1 complete|Cancelled / Not Doing|Environment Isolation|Team Charlie System Health owns" docs_build\dev\ProjectInstructions docs_build\dev\roadmaps
31+
```
32+
33+
Result: PASS. Required backlog, roadmap, and ownership markers are present.
34+
35+
## GitHub Validation
36+
37+
- PASS: PR #164 is merged.
38+
- PASS: PR #167 is merged.
39+
- PASS: no open Team Charlie PRs were found after PR #167 merged and before PR_028 opened.
40+
- PASS: no Team Charlie review requests were found for `ToolboxAid`.
41+
42+
## Runtime Scope
43+
44+
- PASS: PR_028 changed files are reports-only.
45+
- PASS: no runtime files changed.
46+
- PASS: no UI, API, database, backlog, roadmap, or Project Instruction source files changed.
47+
48+
## Playwright
49+
50+
Not run. This is a documentation/report-only closeout PR.
51+
52+
## Unit Tests
53+
54+
Not run. This is a documentation/report-only closeout PR.
Lines changed: 117 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,117 @@
1+
# PR_26175_CHARLIE_028-team-charlie-final-closeout
2+
3+
## Summary
4+
5+
Final Team Charlie repository closeout after merging PR #164 and PR #167.
6+
7+
This report is documentation/report-only. It does not change runtime, UI, API, database, backlog, roadmap, or Project Instruction source files.
8+
9+
## Completed PRs
10+
11+
| PR | Title | Merge Commit |
12+
| --- | --- | --- |
13+
| #93 | `PR_26172_CHARLIE_001-repository-compliance-audit` | `f2b50ac9d79256df3a7716ac4eff21f3a4303bb3` |
14+
| #94 | `PR_26172_CHARLIE_002-test-results-artifact-cleanup` | `dd72e8396e7b5544bffa54d6730217a8030be457` |
15+
| #151 | `PR_26175_CHARLIE_007-system-health-environment-identity` | `0e25639fb023653bda679290f5748fa0c3a00a8f` |
16+
| #152 | `PR_26175_CHARLIE_008-system-health-current-database-health` | `9701da23450d26d3e1fc00f1fe2653e986e84e55` |
17+
| #153 | `PR_26175_CHARLIE_009-system-health-current-r2-health` | `939c2ab327a2c792c184748d74844914f1b77a90` |
18+
| #155 | `PR_26175_CHARLIE_010-system-health-history-and-closeout + 011-admin-submenu-alphabetical-order` | `d4f4279501abf3d9aaa7f857aa240f6e019b8229` |
19+
| #158 | `PR_26175_CHARLIE_012-024-system-health-completion` | `48d52b1a1f4116fd5c4694e8ec7b1f1e3a3d6e4e` |
20+
| #162 | `PR_26175_CHARLIE_025-system-health-backlog-closeout` | `dbd92d1866c13f62782f54b9b7f7b525cd771514` |
21+
| #164 | `PR_26175_CHARLIE_026-charlie-governance-gap-closeout` | `a66048f50519f4f49b821f69af05d990448c7c74` |
22+
| #167 | `PR_26175_CHARLIE_027-final-charlie-audit` | `245c30dda9cfb6531173c6d9182afe120df8fc9f` |
23+
24+
## Final Repository Status
25+
26+
- Main commit after PR #167 merge: `245c30dda9cf`.
27+
- Main branch verification after PR #167 merge: PASS.
28+
- Worktree before PR_028 branch creation: clean.
29+
- Local/origin sync before PR_028 branch creation: `0/0`.
30+
- Branch deletion: not performed.
31+
32+
## GitHub Audit
33+
34+
- PASS: no open Team Charlie PRs were present after PR #167 merged and before this PR_028 branch was opened.
35+
- PASS: no draft Team Charlie PRs were present after PR #167 merged and before this PR_028 branch was opened.
36+
- PASS: no Team Charlie review requests were found for `ToolboxAid`.
37+
- Note: this PR_028 branch is the final administrative closeout artifact and is not merged by this report.
38+
39+
## Branch Inventory
40+
41+
| Branch | Merged Into Main | Behind Main | Ahead Main | Notes |
42+
| --- | --- | ---: | ---: | --- |
43+
| `origin/pr/26172-CHARLIE-001-repository-compliance-audit` | yes | 214 | 0 | retained |
44+
| `origin/pr/26172-CHARLIE-002-test-results-artifact-cleanup` | yes | 212 | 0 | retained |
45+
| `origin/pr/26175-CHARLIE-007-system-health-environment-identity` | yes | 45 | 0 | retained |
46+
| `origin/pr/26175-CHARLIE-008-system-health-current-database-health` | yes | 42 | 0 | retained |
47+
| `origin/pr/26175-CHARLIE-009-system-health-current-r2-health` | yes | 36 | 0 | retained |
48+
| `origin/pr/26175-CHARLIE-010-system-health-history-and-closeout` | yes | 21 | 0 | retained |
49+
| `origin/pr/26175-CHARLIE-025-system-health-backlog-closeout` | yes | 15 | 0 | retained |
50+
| `origin/pr/26175-CHARLIE-026-charlie-governance-gap-closeout` | yes | 4 | 0 | retained |
51+
| `origin/pr/26175-CHARLIE-027-final-charlie-audit` | yes | 1 | 0 | retained |
52+
| `origin/PR_26172_CHARLIE_repository-compliance-stack` | yes | 94 | 0 | retained |
53+
| `origin/PR_26175_CHARLIE_006-project-instructions-system-health-infrastructure` | no | 81 | 1 | orphaned docs/governance branch; no runtime files |
54+
55+
## Backlog
56+
57+
Completed:
58+
- Repository Compliance
59+
- Test Results Cleanup
60+
- System Health v1
61+
- Backlog Closeout
62+
- Governance Closeout
63+
64+
Active Charlie work:
65+
- None.
66+
67+
Future enhancements only:
68+
- Scheduler execution engine
69+
- Outbound notifications
70+
- External alert delivery
71+
- Provider telemetry
72+
- Charts and metrics
73+
- Log viewer
74+
- Operational automation
75+
- Observability integrations
76+
77+
## Roadmap
78+
79+
- PASS: roadmap matches backlog for System Health v1.
80+
- PASS: System Health v1 is complete.
81+
- PASS: future enhancements are separated.
82+
- PASS: cancelled Environment Isolation and runtime-port work is listed as not active roadmap work.
83+
84+
## Project Instructions
85+
86+
- PASS: Charlie ownership is complete.
87+
- PASS: System Health ownership is present.
88+
- PASS: Environment Isolation is marked Cancelled / Not Doing.
89+
90+
## Runtime
91+
92+
- PASS: no Charlie runtime work remains unmerged.
93+
- The only unmerged Charlie branch is `origin/PR_26175_CHARLIE_006-project-instructions-system-health-infrastructure`.
94+
- That branch is docs/governance/report only and changes no runtime, UI, API, or database files.
95+
96+
## Reports
97+
98+
- PASS: PR_026 reports exist.
99+
- PASS: PR_027 reports exist.
100+
- PASS: PR_028 report set exists in this branch.
101+
102+
## Final Charlie Status
103+
104+
- Current Work: COMPLETE
105+
- System Health: COMPLETE
106+
- Governance: COMPLETE
107+
- Backlog: COMPLETE
108+
- Roadmap: COMPLETE
109+
- Future Enhancements: DEFERRED
110+
111+
## Closeout Note
112+
113+
No branches were deleted. PR_028 is not merged by this report because no separate Owner approval was provided for merging PR_028.
114+
115+
## ZIP Artifact
116+
117+
- `tmp/PR_26175_CHARLIE_028-team-charlie-final-closeout_delta.zip`
Lines changed: 6 additions & 5 deletions
Original file line numberDiff line numberDiff line change
@@ -1,6 +1,7 @@
11
docs_build/dev/reports/codex_changed_files.txt
2-
docs_build/dev/reports/PR_26175_CHARLIE_027-final-charlie-audit.md
3-
docs_build/dev/reports/PR_26175_CHARLIE_027-final-charlie-audit-branch-validation.md
4-
docs_build/dev/reports/PR_26175_CHARLIE_027-final-charlie-audit-manual-validation-notes.md
5-
docs_build/dev/reports/PR_26175_CHARLIE_027-final-charlie-audit-requirement-checklist.md
6-
docs_build/dev/reports/PR_26175_CHARLIE_027-final-charlie-audit-validation.md
2+
docs_build/dev/reports/codex_review.diff
3+
docs_build/dev/reports/PR_26175_CHARLIE_028-team-charlie-final-closeout.md
4+
docs_build/dev/reports/PR_26175_CHARLIE_028-team-charlie-final-closeout-branch-validation.md
5+
docs_build/dev/reports/PR_26175_CHARLIE_028-team-charlie-final-closeout-manual-validation-notes.md
6+
docs_build/dev/reports/PR_26175_CHARLIE_028-team-charlie-final-closeout-requirement-checklist.md
7+
docs_build/dev/reports/PR_26175_CHARLIE_028-team-charlie-final-closeout-validation.md
8.95 KB
Binary file not shown.

0 commit comments

Comments
 (0)