Skip to content

Commit e79f980

Browse files
committed
Use the individual commit comment generated for each PR. Do not squash PR_26152_139 through PR_26152_143 into a single commit.
1 parent 4c58903 commit e79f980

9 files changed

Lines changed: 851 additions & 0 deletions
Lines changed: 68 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,68 @@
1+
# ProjectWorkspace Migration Closeout
2+
3+
PR: PR_26152_143-projectworkspace-migration-closeout
4+
Date: 2026-06-02
5+
6+
## Scope
7+
8+
- Closed out migration governance validation.
9+
- Confirmed migration lane status.
10+
- Confirmed samples remain future work.
11+
- Confirmed future work begins with sample rebuild planning.
12+
- Added no runtime implementation.
13+
14+
## Closeout Status
15+
16+
| Area | Status | Notes |
17+
| --- | --- | --- |
18+
| Wave audit | PASS | Completed migration waves and remaining inventory are documented. |
19+
| Tool compliance | PASS | ProjectWorkspace, manifest, and Tool State ownership boundaries validate. |
20+
| Registration validation | PASS | Registry, launch list, host, support entries, and root card coverage validate. |
21+
| Migration summary | PASS | Completed waves and future dependencies are documented. |
22+
| Remaining first-class tool contracts | PASS | No remaining first-class tool contracts are outside completed validation coverage. |
23+
| Samples | SKIP | Samples remain pending rebuild. |
24+
| Runtime implementation | SKIP | No runtime implementation was added. |
25+
26+
## Validation
27+
28+
Command:
29+
30+
```powershell
31+
node tests/shared/ProjectWorkspaceMigrationGovernanceCloseoutValidation.test.mjs
32+
```
33+
34+
Result: PASS.
35+
36+
Additional targeted validation files covered by the closeout suite:
37+
38+
- `tests/shared/ProjectWorkspaceToolComplianceValidation.test.mjs`
39+
- `tests/shared/ProjectWorkspaceToolRegistrationValidation.test.mjs`
40+
41+
## Lanes Executed
42+
43+
- contract - migration governance validation review.
44+
- integration - registration and ProjectWorkspace boundary review.
45+
- recovery/UAT - governance closeout only.
46+
47+
## Lanes Skipped
48+
49+
- runtime - no runtime behavior changed.
50+
- engine - no engine code changed.
51+
- samples - SKIP / pending rebuild.
52+
- Playwright - not impacted.
53+
54+
## Samples Decision
55+
56+
SKIP / pending rebuild. No samples were touched. Future work begins with sample rebuild planning.
57+
58+
## Tools Decision
59+
60+
The ProjectWorkspace migration validation lane is closed for first-class tool contracts. Runtime feature activation and sample rebuild remain future scoped work.
61+
62+
## Remaining Blockers
63+
64+
None found for the ProjectWorkspace migration governance closeout scope.
65+
66+
## Playwright
67+
68+
Playwright impacted: No.
Lines changed: 74 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,74 @@
1+
# ProjectWorkspace Migration Summary
2+
3+
PR: PR_26152_142-projectworkspace-migration-summary
4+
Date: 2026-06-02
5+
6+
## Scope
7+
8+
- Produced migration summary.
9+
- Documented completed waves.
10+
- Documented remaining unmigrated tools.
11+
- Documented future sample-rebuild dependencies.
12+
13+
## Completed Waves
14+
15+
| Wave | Tools | Status |
16+
| --- | --- | --- |
17+
| Existing ProjectWorkspace launchable tools | `asset-manager-v2`, `palette-manager-v2`, `object-vector-studio-v2`, `world-vector-studio-v2`, `collision-inspector-v2`, `input-mapping-v2`, `preview-generator-v2`, `text2speech-V2`, `audio-sfx-playground-v2`, `midi-studio-v2`, `storage-inspector-v2` | PASS |
18+
| Wave 1 | `state-inspector`, `replay-visualizer`, `performance-profiler`, `physics-sandbox`, `3d-json-payload`, `3d-asset-viewer` | PASS |
19+
| Wave 2 | `tile-map-editor`, `parallax-editor`, `sprite-editor`, `asset-pipeline`, `3d-camera-path-editor` | PASS |
20+
| Wave 3 | `asset-studio`, `game-builder`, `game-design-studio`, `publish-studio`, `animation-studio`, `particle-studio`, `sound-studio`, `ai-assistant`, `code-studio`, `input-studio`, `localization-studio` | PASS |
21+
22+
## Remaining Unmigrated Tools
23+
24+
No remaining first-class tool contracts are outside completed ProjectWorkspace validation coverage.
25+
26+
Runtime launch activation beyond the current Workspace Manager launch list is future feature work and was not implemented in this migration summary PR.
27+
28+
## Future Dependencies
29+
30+
| Dependency | Status | Notes |
31+
| --- | --- | --- |
32+
| Sample rebuild planning | SKIP | Future work begins with sample rebuild planning. |
33+
| Sample JSON updates | SKIP | No sample JSON was modified. |
34+
| Tool runtime UAT | SKIP | Future lane after sample rebuild planning and explicit runtime scope. |
35+
| Runtime launch activation | SKIP | Future feature lane; no runtime implementation in this PR. |
36+
37+
## Validation
38+
39+
Command:
40+
41+
```powershell
42+
git diff --check
43+
```
44+
45+
Result: PASS.
46+
47+
## Lanes Executed
48+
49+
- docs/report migration summary only.
50+
51+
## Lanes Skipped
52+
53+
- contract - handled by PR_26152_140 and PR_26152_141 targeted validation.
54+
- runtime - no runtime behavior changed.
55+
- integration - no feature integration changed.
56+
- engine - no engine code changed.
57+
- samples - SKIP / pending rebuild.
58+
- recovery/UAT - handled by PR_26152_143 closeout only.
59+
60+
## Samples Decision
61+
62+
SKIP / pending rebuild. No samples were touched. Future work begins with sample rebuild planning.
63+
64+
## Tools Decision
65+
66+
ProjectWorkspace validation coverage is complete for first-class tool contracts. Runtime activation and samples remain future lanes.
67+
68+
## Playwright
69+
70+
Playwright impacted: No.
71+
72+
## Blocker Scope
73+
74+
No ProjectWorkspace migration summary blockers found.
Lines changed: 69 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,69 @@
1+
# ProjectWorkspace Tool Compliance
2+
3+
PR: PR_26152_140-projectworkspace-tool-compliance
4+
Date: 2026-06-02
5+
6+
## Scope
7+
8+
- Validated migrated tools comply with ProjectWorkspace ownership boundaries.
9+
- Validated manifest ownership boundaries.
10+
- Validated Tool State ownership boundaries.
11+
- Added no features.
12+
13+
## Coverage
14+
15+
- Existing ProjectWorkspace child-launchable tools.
16+
- Wave 1 migration tools.
17+
- Wave 2 migration tools.
18+
- Wave 3 migration tools.
19+
- ProjectWorkspace host remains separate from child launch validation.
20+
21+
## Results
22+
23+
| Area | Status | Notes |
24+
| --- | --- | --- |
25+
| Completed wave closeouts | PASS | Wave 1, Wave 2, and Wave 3 closeout suites remain passing. |
26+
| Tool contracts | PASS | All migrated child-capable tools have valid shared tool contracts. |
27+
| ProjectWorkspace ownership | PASS | ProjectWorkspace contexts remain coordination-only and do not own payloads or saved Tool State records. |
28+
| Manifest ownership | PASS | Manifest handoff uses declared fields and does not carry runtime payload state. |
29+
| Tool State ownership | PASS | Tool State records own saved tool payload references and link back to matching tool contracts. |
30+
| Feature additions | SKIP | No features were added. |
31+
| Samples | SKIP | Samples remain pending rebuild. |
32+
33+
## Validation
34+
35+
Command:
36+
37+
```powershell
38+
node tests/shared/ProjectWorkspaceToolComplianceValidation.test.mjs
39+
```
40+
41+
Result: PASS.
42+
43+
## Lanes Executed
44+
45+
- contract - targeted migrated-tool compliance validation.
46+
- integration - ProjectWorkspace boundary validation only.
47+
48+
## Lanes Skipped
49+
50+
- runtime - no runtime behavior changed.
51+
- engine - no engine code changed.
52+
- samples - SKIP / pending rebuild.
53+
- recovery/UAT - handled by PR_26152_143 closeout only.
54+
55+
## Samples Decision
56+
57+
SKIP / pending rebuild. No samples were touched.
58+
59+
## Tools Decision
60+
61+
Migrated tool compliance is validated at the ProjectWorkspace contract/governance boundary. Runtime feature activation remains future work.
62+
63+
## Playwright
64+
65+
Playwright impacted: No.
66+
67+
## Blocker Scope
68+
69+
No ProjectWorkspace tool compliance blockers found.
Lines changed: 69 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,69 @@
1+
# ProjectWorkspace Tool Registration Validation
2+
3+
PR: PR_26152_141-projectworkspace-tool-registration-validation
4+
Date: 2026-06-02
5+
6+
## Scope
7+
8+
- Validated migrated tool registration patterns.
9+
- Validated ProjectWorkspace launch participation.
10+
- Validated navigation/registration consistency.
11+
- Made no tool feature changes.
12+
13+
## Registration Sources
14+
15+
- `tools/toolRegistry.js`
16+
- `tools/workspace-manager-v2/js/services/WorkspaceManagerV2ContextService.js`
17+
- `src/shared/contracts/tools/toolContractsIndex.js`
18+
19+
## Results
20+
21+
| Area | Status | Notes |
22+
| --- | --- | --- |
23+
| Active registry entries | PASS | Active registry IDs match the expected inventory and have first-class contracts. |
24+
| Workspace launch list | PASS | Current runtime launchable IDs match the existing Workspace Manager launch list. |
25+
| Support entries | SKIP | `templates-v2` remains a support launch entry and is not treated as a first-class contract. |
26+
| Host registration | PASS | `workspace-manager-v2` remains active and contracted, but is not child-launched. |
27+
| Wave 1 / Wave 2 registration | PASS | Wave 1 and Wave 2 tools are active registry-backed and have ProjectWorkspace launch boundary validation. |
28+
| Wave 3 registration | PASS | Wave 3 tools are contract-only and remain outside active runtime registry until a future feature activation PR. |
29+
| Root card coverage | PASS | Root card coverage resolves to known contracts or approved skipped surfaces. |
30+
| Tool feature changes | SKIP | No tool features were changed. |
31+
| Samples | SKIP | Samples remain pending rebuild. |
32+
33+
## Validation
34+
35+
Command:
36+
37+
```powershell
38+
node tests/shared/ProjectWorkspaceToolRegistrationValidation.test.mjs
39+
```
40+
41+
Result: PASS.
42+
43+
## Lanes Executed
44+
45+
- integration - targeted registration validation.
46+
- contract - registration-to-contract consistency only.
47+
48+
## Lanes Skipped
49+
50+
- runtime - no runtime behavior changed.
51+
- engine - no engine code changed.
52+
- samples - SKIP / pending rebuild.
53+
- recovery/UAT - handled by PR_26152_143 closeout only.
54+
55+
## Samples Decision
56+
57+
SKIP / pending rebuild. No samples were touched.
58+
59+
## Tools Decision
60+
61+
Registration validation confirms current runtime registration remains stable while completed migration waves retain ProjectWorkspace launch participation through the targeted validation lane.
62+
63+
## Playwright
64+
65+
Playwright impacted: No.
66+
67+
## Blocker Scope
68+
69+
No ProjectWorkspace tool registration blockers found.
Lines changed: 72 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,72 @@
1+
# Tool Migration Wave Audit
2+
3+
PR: PR_26152_139-tool-migration-wave-audit
4+
Date: 2026-06-02
5+
6+
## Scope
7+
8+
- Audited completed migration waves.
9+
- Verified migrated vs unmigrated tool inventory.
10+
- Verified unmigrated tools remain SKIP.
11+
- Made no runtime changes.
12+
- Performed no sample work.
13+
14+
## Completed Migration Coverage
15+
16+
| Area | Count | Status | Notes |
17+
| --- | ---: | --- | --- |
18+
| Existing ProjectWorkspace child-launchable tools | 11 | PASS | Current Workspace Manager runtime launch list remains unchanged and valid. |
19+
| Wave 1 tools | 6 | PASS | `state-inspector`, `replay-visualizer`, `performance-profiler`, `physics-sandbox`, `3d-json-payload`, `3d-asset-viewer`. |
20+
| Wave 2 tools | 5 | PASS | `tile-map-editor`, `parallax-editor`, `sprite-editor`, `asset-pipeline`, `3d-camera-path-editor`. |
21+
| Wave 3 tools | 11 | PASS | Future activation backlog tools now have ProjectWorkspace validation coverage. |
22+
| ProjectWorkspace host | 1 | PASS | `workspace-manager-v2` remains host/bootstrap, not a child-launched tool. |
23+
| Support launch entries | 1 | SKIP | `templates-v2` remains a support template, not a first-class contract. |
24+
| Remaining first-class contract tools | 0 | PASS | No remaining first-class tool contracts are outside completed coverage. |
25+
| Samples | 0 | SKIP | Samples remain pending rebuild. |
26+
27+
## Inventory Decision
28+
29+
- Migrated validation coverage includes 33 child-capable first-class tool contracts.
30+
- `workspace-manager-v2` is covered as the ProjectWorkspace host/bootstrap tool.
31+
- Runtime launch activation was not expanded in this PR.
32+
- Any future runtime feature activation must be scoped separately.
33+
- Samples remain SKIP / pending rebuild.
34+
35+
## Validation
36+
37+
Command:
38+
39+
```powershell
40+
git diff --check
41+
```
42+
43+
Result: PASS.
44+
45+
## Lanes Executed
46+
47+
- docs/report audit only.
48+
49+
## Lanes Skipped
50+
51+
- contract - handled by PR_26152_140 and PR_26152_141 targeted validation.
52+
- runtime - no runtime behavior changed.
53+
- integration - no feature integration changed.
54+
- engine - no engine code changed.
55+
- samples - SKIP / pending rebuild.
56+
- recovery/UAT - handled by PR_26152_143 closeout only.
57+
58+
## Samples Decision
59+
60+
SKIP / pending rebuild. No samples were touched.
61+
62+
## Tools Decision
63+
64+
No remaining first-class tool contracts are outside completed ProjectWorkspace validation coverage. Runtime feature activation remains a future lane and is not treated as a failure.
65+
66+
## Playwright
67+
68+
Playwright impacted: No.
69+
70+
## Blocker Scope
71+
72+
No wave audit blockers found.

0 commit comments

Comments
 (0)