-
Notifications
You must be signed in to change notification settings - Fork 1
Pull requests: PolicyEngine/populace-dynamics
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
E4/E5 minimal-audit manifest: registered design (ADR 0004, pre-lock)
#236
opened Jul 17, 2026 by
daphnehanse11
Collaborator
Loading…
Cross-wave job-ID consistency check: PASS (pre-lock artifact for #230 §6)
#235
opened Jul 17, 2026 by
daphnehanse11
Collaborator
Loading…
C3 employer gate block: thresholds, partitions, and rulings (draft for referee)
#230
opened Jul 17, 2026 by
vahid-ahmadi
Contributor
•
Draft
J2J sex×age + J2JOD origin×destination firm-size extracts (E2/E11 references, pre-C3)
#228
opened Jul 17, 2026 by
vahid-ahmadi
Contributor
Loading…
C3 linkage-QC requirements: precision floors, adjudication samples, linkage-bias reweighting (LIFE-M discipline)
#224
opened Jul 16, 2026 by
MaxGhenis
Contributor
Loading…
DRAFT: pre-C3 noise floors — the Workstream B aggregate-side battery (E1, E2, E6/E7; E11/E12 gaps recorded)
#223
opened Jul 16, 2026 by
vahid-ahmadi
Contributor
•
Draft
DRAFT: SIPP-vs-J2J seam-reconciliation artifact (pre-C3)
#214
opened Jul 15, 2026 by
daphnehanse11
Collaborator
Loading…
DRAFT: pre-C3 noise floors — the full Workstream A battery (E3, E4/E5, E8/E9)
#212
opened Jul 15, 2026 by
daphnehanse11
Collaborator
Loading…
ProTip!
Follow long discussions with comments:>50.